Sanjay kher

𝑺𝒂𝒏𝒋𝒂𝒚 𝑲𝒉𝒆𝒓

Professional

Experience

  • Humility + Fortitude
  • Young energetic, enthusiastic and result oriented with 37 years Multi faceted Professional experience (at 22 years age)   in Project implementation / Contract Management & operation / leadership in Power Sector & Renewable Energy.
  • Risen from Foot soldier with Proven leadership skills
  • Topper BE (Hons) in Civil Engineer from NIT (formerly REC) Srinagar, Kashmir with 3 Tier Sr MP from IIM Ahmadabad and MDP from IIM Lucknow.
  • Extensive on Campus exposure & training in TQM from AOTS , Japan under Indo Japanese Scholarship.
  • Implementation /execution of large scale infrastructure/ Power Projects.
  • Working /Worked on Solar Parks (2X 600 MW , 1X 800 MW, 50 MW Inaugurated by Hon’ble PM), Hybrid Energy with hydro Storage, Green Hydrogen,
  • In depth Concept to Commissioning experience of Multipurpose Dams, ROR & Pump Storage Power Projects ( 1000 MW Tehri Dam, 1000 MW PSP, 400 MW Koteshwar, 444 MW VPHEP, 108 MW Jelam Tamak HEP etc),
  • Associated with Super Critical Khurja Thermal Power Plant(2X660 MW )
  • Amelia Captive Coal Mine at Singrauli MP.
  • Headed two Power Projects .
  • ACE experience in DCB & ICB Tenders / reverse Auction/ Consortium bidding / Overall / Umbrella agreements ;
  • Expert in Contract Operation/Management ; DRB/ Arbitration
  • Proven experience in Commercial Negotiations with leading International Suppliers/ Contractors- Siemens, Germany, Hitachi, Japan, Sumitomo, Mitsui, Doosan, Korea, alstom France, EME/ Power Machines Russia/ Ukraine etc .
  • In Ist attempt achieved many Successful Public Hearings of major Hydro & Thermal Power projects which are major bottlenecks for the Project to take off.
  • Innovation in Land Acquisition on long term 30 year lease rent basis % obtaining of FRA..
  • Implemented CSR using innovative methods with PAPs participation – Corporation got Ist Prize from Hon’ble President of India.
  • Financial Packages (Supplier & Buyers credit) on best terms / LIBOR +; EDF France, KfW, World Bank, Russian Suppliers etc.
  • Best in Business development/ PR Skills/ Ministry Govt. of India Liaison.
  • Executed JV with NPCIL/ Govt of UP/ PSPs/ Dhukwa / Nepal / Bhutan.
  • International experience- middle east for time bound execution of large scale Projects.
  • I am Sanjay Kher aged 59 years ( in 2021) working as General Manger (Solar) in THDC INDIA LIMITED (THDCIL) , a Central Govt PSU in the Power Sector in India. THDCIL have constructed the World famous TEHRI DAM PROJECT which besides being the highest dam in Asia with 260.5 m height, provides peaking Power to 9 Northern states of India in addition to drinking water to 4 000 000 population in capital city Delhi of India on daily basis. It also irrigates 2.4 lac hectares of barren land in the state of UP besides stabilizing existing 6.4 lac hectares of Irrigated land. Additionally THDCIL has diversified into Renewable energy of Wind, Solar, Green Hydrogen, Hybrid Energy. THDCIL is also executing the 1980 MW fossil fuel Super Critical Thermal Plant.
    Prior to this I was working abroad in Iraq/ Kuwait on major Infrastructure Projects for a period of around 5 years.
  • I have over a period of 37 years of my Professional experience earned diversified skills both on field and in office in the Power Sector on the Renewable Energy Stream including the Hydro Power Projects and Super Critical Thermal Energy including the Coal Mines.

Jhansi: PM Modi to lay foundation stone of ultra mega solar park in Jhansi – The Economic Times –

https://m.economictimes.com/industry/renewables/pm-modi-to-lay-foundation-stone-of-ultra-mega-solar-park-in-jhansi/articleshow/87772396.cms?utm_source=whatsapp_pwa&utm_medium=social&utm_campaign=socialsharebuttons

PRESENTLY  FOLLOWING  ASSIGNMENTS HANDLED

  • Grid Connected Solar Pv Projects (2×600 Mw + 1×800 Mw ) At Lalitpur, Jhansi
  • 800 Mw Solar Pv Project At Chitrakoot
  • 10,000 Mw Solar Park, Rajasthan. (Mou, Land Identified)
  • Green Hydrogen
  • Hybrid Energy (Solar With Hydro Storage).


BRIEF BACKGROUND  IS AS UNDER ;

  • Hybrid Energy (Solar + PSP) : 2X600 MW Solar Parks blended with 1000 MW PSP storage which is a challenging work for renewable energy sector for the Nation/ World.
  • Also looking the after development of Green Hydrogen from our 800 MW Chitrakoot Solar Park in UP. for green Hydrogen for Petroleum & Fertilizer Industry/ inputs furnished to Ministry for GH Purchase obligations
  • Grid connected Utility scale 2X600 MW Solar Parks at Lalitpur & Jhansi. Invitation of Expression of Interests; Member of High level recommendation Committee at Lucknow; MNRE meetings chaired by Hon’ble Minister , GoI: Procurement of Land & finalization of lease rent charges for 2X600 MW UNREPPs/ Ultra Mega Solar parks in Lalitpur & Jhansi and 800MW in Chitrakoot, Ist time in Bundelkahnd & Uttar Pradesh.
  • Acquisition of the Private Land is one of the critical infra ingredients for the Solar Park(s). An innovative and unique model was followed first time in the Renewable Energy Power Sector in India. This besides saving considerable money through land aggregators shall also result in keeping the tariffs lower/competitive for the DISCOMs/Consumers where electric power is to be eventually sold through PPA/ PSA ceiling tariffs. This has given a much appreciated leverage to the Organization in moving ahead in the lead in establishing the two important National Solar Parks/ UMREPPs under Mode 8 of National Solar Mission of MNRE, GoI at Lalitpur and Jhansi, followed with 800 MW Solar Park at Mau, Chitrakoot, first of its kind in the backward region of Bundelkhand UP.

  • The above has also become a model for other major renewable Power Sector Organizations like NTPC /NHPC to follow in establishing Ultra Mega Renewable Energy Power Parks in UP, India. Thus the Company are the 1st to submit the DPRs of the UMREPPs / Solar Parks under Mode – 8, Solar Power Scheme to MNRE, GoI in the Country. Besides, this has given a push and impetus to the much awaited 4000 MW GEC/Green Energy Corridor–II in Bundelkhand by the Govt of India. Also involved in the finalisation of seamless grid connectivity of 400/765 KV Transmission corridor at ORAI, UP & LILO option on 765 KV Lalitpur Agra Transmission line for the above Mega Solar Proje Discussions with PGCIL and route survey, Estimates of Pooling Sub stations/PSS and Grid Sub Stations /GSS, interconnecting 220 KV transmission lines etc within the Solar Park & outside the Solar park through UP Power Transmission Corporation Ltd./ PGCIL.
  • Managed team of professionals across three Ultra Mega Solar Power Project Sites.
  • Topographic Survey/ Geotechnical Investigations/ Hydrological Studies./DPR.
  • 50 MW Solar Power Project at Kerala inaugurated by Hon’ble PM.
  • CSR for Covid 19 relief to 15 Village Gram Panchayats in several districts.
  • 1500 MW Solar Park in Rajasthan ( MOU, Land Identified)
  • Result oriented and Chaupal Meetings with Gram Panchayats along with the district administration ,SDM/ADM/ CDO.

Hydro Electric Projects at Joshimath Uttarakhand.

  • The work at 444 mw vishnugad dipalkot hydro electric, project , 104 mw malan jelam & 114 jelam tamak hydro electric projects, involved multi faceted experience from construction of roads in hilly terrain in most challenging environment, township,, topographic survey for 56 kms using total station leica make state of the art & detailed investigation, fr, dpr, geotechnical investigations, drilling & drifting,, adits,, tunneling by tbm & dbm, bailey bridge erection (army type), 75 r rcc bridge, approach road to dam site in nearly vertical terrain; cofferdam construction etc.
    Land acquisition of 8.2 ha & 84 ha of forest land, and more than 300 ha of gram sabha land / pvt land,
    Eia study & mitigation under environment protection act 1986 and ppt to eac and environmental clearance from moef.
    Led the world bank site missions from the client organization to site. World bank finally provided usd 648 million loan to the project.
    Innovation & creativity in signing of tripartite agreement with the villagers / gram pradhans/ gram panchayats for smooth execution of the projects & unique / participative csr works.

    Also associated in the implementation/ execution of the koteshwar dam – 400 mw , tehri psp- 1000 mw, vphep – 444 mw, jt hep 114 mw & mj hep 63 mw at various stages as a construction & contract expert.
    Associated in the finalisation of french aid and conclusion of agreement for consultancy services for preparation of detailed project report for 1000 mw tehri pump storage plant, being carried out by edf/cob, french consultants.
    Preparation of terms and conditions/ commercial conditions / technical specs. Of civil works of 1000 mw tehri pump storage plant and invitation of bids / award of works.
    Comparative study of the most critical and important decision of 2 speed & variable speed option for the 1000 mw tehri psp.

The importance of the tehri dam hydro power complex, with various unique structures and massive underground construction features of power house, shaft spillways, chute spillways, hrt, penstocks, trt etc can be gauged from the fact that legendary metro man shri e sreedharan on his visit to the tehri dam complex was exceptionally happy to see the engineering marvel and asked his engineers in dmrc to have tehri dam & its underground power house cavern & other structures as a must see in their technical up gradation itinerary.

TEHRI DAM PROJECT (1000 MW) –

(Worked At The Most Important National Important Hydro Power Project From Concept 2 Commissioning )

  • Construction of tehri dam, like bhakra dam ( temple of modern india), is a once in life time event and I feel privileged to have been associated in it’s execution / implementation from concept to commissioning.
  • During the period acquired multi disciplinary experience in execution, DCB & ICB Bidding/DPR /Packaging /R&R/ Ministry Liasion/ CSR/ Works, Supply & Service Contracts/ Procurement of Power Plant Equipment from Abroad/ Inspections at Russia, Ukraine, Germany/DRB/ Arbitration/ Township/ Roads/ Bridges/ spillways/earth & rockfill dam/ coffer dam/under ground power house/ tunneling by dbm etc.
  • The 260.5 m high tehri dam is the highest earth and rockfill dam in asia. It involved resettlement & rehabilitation of 13841 families with irrigation benefits of 2.7 lac ha. Of land in up and drinking water for 40 lac population in delhi & 30 lac population in up. It has numerous other multipurpose benefits. The top most benefit of tehri dam is in giving 1000 mw peaking power to 9 states of northern india for grid stabilization and helping in the kumbh mela at hardwar india , when there is draught like situation. It also saved rishikesh from devastation due to 2013 floods as it absorbed the inundation of bhagirathi river for more than 72 hours.
  • Marine & inland transportation of thousands of packages/sub-assemblies from illychevsk port, ukraine /russia to tehri site valuing approx. 121 million us $ completed through power machines, ojsc / russian supplier and alstom/germany & gis/gib from siemens, germany.
  • Total tonnage shipped on fob basis 16000 mt/23000 cbm.
  • Bids under icb with financing arrangements by way of buyers’ credit from kfw, germany from m/s siemens/ alstom/ abb , germany, with sovereign guarantee of goi.
  • High level delegation negotiations at moscow with consortium of suppliers for resolution of the most critical commercial dispute of bills of exchange of eme russia.
  • Finalization of drb panel for various works contracts.
  • The works of spillway structures had come to a grinding halt affecting in daily loss of crores after the tragic accident at site . Emergency mission conducted and microsilica procured from jabel ali port, dubai on most urgent basis.
  • Commissioning / 72 hour trial run.
  • DPR Preparation, Survey & Investigation of 2X660 MW Khurja Super Thermal Power Project at Bulland shahr UP
  • TOR finalization, EIA/ EMP Preparation, Public Hearing at Site, PPT presentations before EAC & obtaining of Environment Clear
  • Land acquisition of 1200 hectares: Aligarh drain , make up water from Ganga Canal, NHAI highway diversion, Railway Siding at danwar Eastern Freight dedicated Corridor etc.
  • PMC, Contract Packages optimized into 7 packages, Award of major SG Boiler Package to L&T MHPS & TG Packages to BHEL
  • Construction of Boundary Wall of 13.5 kms.
  • Got best Coal Mine at Amelia Singrauli MP allotted from MOC amongst 214 cancelled ones and PR, FC, EC obtained. Also MDO in progress.

 
 
  • India is a democracy and the local villagers/ People’s participation and support is a must & critical for the smooth implementation of the large scale Projects.
  • Be it Solar, Wind, Hydro, Thermal or Coal Mine/ infrastructure Project, right from day one the Local Villagers/ Grams Pradhans/ Gram Panchayats and district administration have been involved in the development effort.
  • Organized Cricket Tournaments, Medical Camps, Books & Uniforms for Children, free bus services in remote areas and utensils for community kitchens have been welcomed and appreciated by the Villagers falling in the catchment of the Project. The Public hearings, survey investigations etc have proceeded smoothly.
  • This can be seen from the Photos & Press coverage attached herewith.
  • EXPERIENCE IN LAND ACQUISITION ( FOREST /GOVT./ PVT)
  • SOLAR PROJECT 30 YEAR LEASE INNOVATIVE MODEL
  • MOEF CLEARANCE OF LARGE PROJECTS WITH SUCCESSFUL PUBLIC HEARINGS
  • CONTRACT MANAGEMENT/ INTERNATIONAL COMMERCIAL NEGOTIATIONS
  • TRANSMISSION / EVACUATION OF POWER EXPERIENCE
  • BUSINESS DEVELOPMENT /PPA/ PSA/ JVC/CONSORTIUM EXPERIENCE
  • HEADED TWO MAJOR GREEN ENERGY /HYDRO POWER PROJECTS
  • INTERNATIONAL EXPERIENCE PRESS CLIPPINGS
  • Citation from Commander DGBR/ Border Roads Organization.
  • Citation from Gram Pradhan Niti ( representing 22 Gram Panchayats)
  • Citation from Central water Commission, GOI

CITATIONS & TESTIMONIALS

  • BE (HONS ) IN CIVIL ENGINEERING FROM NATIONAL INSTITUE OF TECHNOLOGY , SRINAGAR KASHMIR
  • PRE UNIVERSITY TOPPER AT J&K BOARD
  • MATRICULATION TOPPER AT J& K BOARD
  • MERIT CERTIFICATES & AWARDS
  • ADVANCE DIPLOMA IN MANAGEMENT
  • IIM AHMEDABAD – 3 TIER SENIOR MANAGEMENT PROGRAMME
  • IIM LUCKNOW – MDP Course
  • AOTS JAPAN IN CAMPUS COURSE(TQM)
  • SAFIR.

For Few Referrals For My Professional Acumen & Expertise Please Contact:

 

  1. Mr Anil Razdan, IAS ex Secretary (Power) Govt. of India Mob +91-9810352108
  2. Mr M L Gupta ex CMD, THDCIL Mob +91-9810463331
  3. Mr K L Zutshi ex CMD , THDCIL Mob +91-9818478900
  4. Mr V Shanmugam IAS DM , Tehri Mob +91-9412007777
  5. Mr P. K .Modi CEO, NTPC Jhajjar JV Mob +91-9818648429
  6. Mr S K Shahi Jt Secy , Ministry of Coal GoI Mob +91-9910922334
  7. Mr T. K Khosa Hydro Expert from J&K Govt  & THDCIL Mob +91-9871495576
  8. Mr Dilip Nigam Adv. MNRE, GoI, N Delhi Mob +91-9891184867
  9. Mr Tarun Saketh MNRE, GoI, N Delhi Mob +91-7358027510
  10. Mr Radhey Shyam MNRE, GoI, N Delhi Mob +91-9929205059
  11. Ms Sanchita Jindal Director MOEF Mob +91-9810865227
  12. Mr BB Barman Adv MOEF Mob +91-9810804832
  13. Mr R Mahajan PCCF ( Principal Chief Conservator of Forest)  , Govt of Uttarakhand Mob +91-9412056912
  14. Prof Sailesh Gandhi IIM Ahmedabad Mob +91-7966324864
  15. Prof S K Barua Director , IIM Ahmedabad Mob +91-9824013022
  16. Prof Hans Dholkia IIM Lucknow Mob +9811014264
  17. Prof Ashok Bhat IIM Lucknow Mob +91-9810021362
  18. Mr Bhawani Singh IAS Director, Renewable Energy- UPNEDA Lucknow Mob +91-9580336919
  19. Mr Anil Gupta IAS MD, Renewable Energy- RREC, Rajasthan Mob +91-9829351518
  20. Mr SR Mahalda Director (T) Renewable Energy- RREC, Rajasthan Mob +91-7742222660
  21. Mr Ajitabh Sharma IAS Pr Secy Energy Chairman RREC & Govt of Rajasthan Mob +91-8432007007
  22. Mr Yogesh Shukla IAS ex DM Lalitpur (now at Bapu bhawan Lucknow) Mob +91-9454412616
  23. Mr Andhra Vamsi, IAS DM, Jhansi Mob +91-9454417547
  24. Mr Nikhil T Funde IAS DM Mob +91-9028977136

Few Video

DOMESTIC & INTERNATIOANAL

01/1985 – Current

DOMESTIC & INTERNATIOANL | INDIA & MIDDLE EAST

 

POWER SECTOR ENGINEER ( RENEWABLE, HYDRO, THERMAL)

A Civil Engineer topper from NIT , Srinagar Kashmir with 3 Tier Sr Management Course from IIM Ahmedabad having 37 years professional experience (at 22 years age) in leadership/ Contract Management/ CSR/ Forest & Environment Clearances from MoEF / Land Acquisition/ Ministry Liaisoning / Business Development/DCB & ICB Bidding & reverse auction/ Execution of Conventional Power & Renewable Solar Energy Power Projects using innovation , creativity & state of the Art technology.

THDC INDIA LIMITED

  • 08/2017 – Current

THDC INDIA LIMITED | DELHI, INDIA GENERAL MANAGER

 

PRESENTLY WORKING AT THDC INDIA LIMITED – A CATEGORY 1 SCHEDULE A CPSU UNDER MINISTRY OF POWER,GOVT. OF INDIA ON FOLLOWING ASSIGNMENTS :

  • GRID CONNECTED SOLAR PV PROJECTS (2X600 MW + 1X800 MW ) AT LALITPUR, JHANSI & CHITRAKOOT
  • 1500 MW SOLAR PARK AT RAJASTHAN.
  • GREEN HYDROGEN,
  • HYBRID ENERGY.

BRIEF BACKGROUND IS AS UNDER ;

  • Hybrid Energy (Solar+ PSP) : 2X600 MW Solar Parks blended with 1000 MW PSP.
  • Development of Green Hydrogen from 800 MW Chitrakoot Solar Park in UP. for Petroleum & Fertilizer Industry.
  • Member of High level Committee at Lucknow; MNRE meetings chaired by Hon’ble Minister , GoI: Chitrakoot, Ist time in Bundelkahnd & Uttar Pradesh. The unique model now being followed by major renewable Power Sector Organizations like NTPC /NHPC/ SECI for land acquisition. Thus the Company are the 1st to submit the DPRs of the UMREPPs / Solar Parks under Mode – 8, Solar Power Scheme to MNRE, GoI in the country.
  • 4000 MW GEC/Green Energy Corridor–II in Bundelkhand by the Govt of India.
  • Managed team of professionals across three Ultra Mega Solar Power Project Sites.
  • 50 MW Solar Power Project at Kerala inaugurated by Hon’ble PM.
  • CSR for Covid 19 relief to 15 Village Gram Panchayats in several districts. Lalitpur, DM Jhansi & Pr Secy Energy/ACS at Lucknow.
  • 765/ 400 KV Grid connectivity through CTU for Inter state and 400 KV through STU for intra state Power evacuation. Discussions with PGCIL and route survey, Estimates of Pooling Sub stations and Grid Sub Stations , interconnecting 220 KV transmission lines etc within the Solar Park & outside the Solar park through UP Power Transmission Corporation Ltd./ PGCIL.

THDC INDIA LIMITED

03/2014 – 08/2017

THDC INDIA LIMITED & GOVT. OF INDIA | DELHI/RISHIKESH/ JOSHIMATH/TEHRI/IRAQ/DUBAI/KUWAIT/RUSSIA, INDIA AGM – ASST. EXECUTIVE ENGINEER

 

2X660 MW KHURJA THERMAL STPP & 8.74 MTPA CAPTIVE COAL MINE/ PUBLIC HEARING/TOR/MOEF CLEARANACE/ LAND ACQUSITION/ DPR/ CONTRACTSPACKAGING / MOC CLEARANCE/RAILWAY SIDING

  • During the huge period of onsite & offsite experience also involved in the 2X660 MW Super critical Khurja Thermal Power Project at Bulandshahar UP.
  • 2X660 MW and 1X660 MW KSTPP DPR, preparation through NTPC , it’s vetting and finalization / approval from the Govt of India & other statutory authorities.
  • Public Hearing conducted Successfully at the Khurja Project Site in one go along with the State Pollution Control Board and the district authorities.
  • TOR Presentation to EAC of Moef and its approval and Environmental Clearance from MOEF land of 500 m on both sides in National Interest.
  • RFP invitation , Engineer’s Consultant engagement/ PMC Contract , Railway siding etc.
  • work awarded in 7 Packages ; major one of TG to BHEL & SG to L&T MHPS.

8.74 MTPA CAPTIVE COAL MINE

  • Also involved in the Procurement of Coal Mine at Amelia, Singrauli with 8.74 Million Tonne p.a Capacity to cater to the Coal needs of the 2X660 MW Super critical Thermal Power Plant at Khurja.
  • CMPDI , SBI Caps were engaged for Project report preparation & other clearances along with SBI Caps for MDO (Mine development operator)

THDC INDIA LIMITED

07/2009 – 03/2014

THDC INDIA LIMITED | PIPALKOTI/ JOSHIMATH/ UTTARAKHAND, INDIAADDL./ DY.GENERAL MANAGER

 

PROJECT EXECUTION-

DAM APPROACH ROAD/ DRILLING DRIFTING/ TBM TUNNELING/ BAILEY BRIDGE/ R&R/ CSR/ DPR /SURVEY & INVESTIGATION/ LAND ACQISITION/ EIA/EMP// EAC & FAC MOEF CLEARANCES

  • The work at 444 MW Vishnugad Dipalkot Hydro Electric, project , 104 MW Malan Jelam & 114 Jelam Tamak Hydro Electric Projects, involved multi faceted experience from construction of roads in Hilly Terrain in most challenging environment, Township,, Topographic Survey using Total Station Leica make state of the art & detailed Investigation, Topographic Survey over a stretch of more than 56 kms, FR, DPR, Geotechnical Investigations, Drilling & Drifting,, Adits, Tunnels, Tunneling by TBM & DBM, Bailey Bridge erection (army type), 75 R RCC Bridge, Approach road to 444 MW VPHEP Concrete Dam Site; Cofferdam etc
  • Land acquisition of 8.2 ha & 84 ha of Forest Land, and more than 300 ha of Gram Sabha Land , Civil Soyam & Pvt Land with signatures from DFO, CF, CCF and Nodal Officer of the State Govt and Environment Pr.Secy., PPT before FAC of MoEF and Forest Clearance FROM moef.
  • Compliance of Forest Rights Act,2006,
  • EIA Study & mitigation under Environment Protection Act 1986 and PPT to EAC and Environmental Clearance from MOEF.
  • Led the World bank Site missions from the Client Organization to site. World Bank finally provided USD 648 Million loan to the Project. Project. Water Supply Scheme for Village Panchayats, Approach foot path, School upgradation, Organized Cricket Tournament amongst 22 village panchayats, Utensils for Community use, Bags & Uniform, books for School children, daily free bus to remote Hydro electric Projects.
  • Innovation & creativity in Signing of Tripartite agreement with the Villagers / Gram Pradhans/ Gram Panchayats for smooth execution of the Projects.

THDC INDIA LIMITED

10/2007 – 07/2009

THDC INDIA LIMITED | RISHIKESH, INDIA DY GENERAL MANAGER

 

GOVT./ MINISTRY LIASIONIG /

STRATEGIC PLANNING / BUSINESS DEVELOPMENT

  • In record time of 5 months obtained the TEC of 444 MW Vishunugad Pipalkoti Hydro Electric Project , (after due clearances from 14 directorates of CWC/CEACSMRS/ Ganga Commission /GSI etc), from CEA, GoI.
  • PIB clearance of VPHEP (444 MW) from Ministry of Finance,GoI
  • CCEA Clearance of VPHEP.
  • No objection of Vishunugad Pipalkoti Hydro Electric Project (4×111 MW) obtained from International angle from Ministry of Water Resources, Govt. of India.
  • Clearance of Revised Cost Estimate (RCE-II) of Tehri HPP Stage I (100 MW) for Rs 8198 W,(Nov 2005 PL).

BUSINESS DEVELOPMENT

  • Alternate proposals of Utyasu Dam forwarded to Govt. Uttaranchal.
  • Coordinated with Secretary Power GoI and at the CS level at Himachal Pradesh & Uttarakhand for bagging the Kishau Dam 600 MW . I was successful in upgradation of the Project from ‘C’ category to ‘B’ category. MOU signing being pursued alongwith the elaboration/ updation of DPR through WAPCOS. Pursued at the highest level in Ministry of Water resources & organized meeting of 7 states irrigation ministers of Northern India chaired by Minister of Water Resources at Sharam Shakti Bhawan for ok and cabinet decision for 90% irrigation component funding by GoI. Concrete Arch Dam Finalized for the Project.
  • MOU with Nuclear Power Corporation Ltd. concluded including its signing between CMD NPCIL & CMD THDC in presence of Hon’ble Minister of Power ,GoI. NPCIL Mumbai for bagging the two Pump storage Projects ( 800 MW and 600 MW) by the corporation. Finally successful in allotment of the two PSPs by Maharashtra to the Corporation which is now a boon for the SOLAR STORAGE IN INDIA.
  • Successful completion of the first mission of the World Bank to Pipalkoti and other sites resulting in World Bank sanction of USD 648 Million for the VPHEP implementation.
  • Obtained allotment of Dhukwa SHP in Jhansi to the Corporation which is since commissioned and generating Power to the grid.

THDC INDIA LIMITED

04/1990 – 10/2007

THDC INDIA LIMITED | TEHRI / DELHI, INDIA ENGINEER – SR MANAGER

 

TEHRI DAM PROJECT (1000 MW) – Concept 2 Commissioning

CONSTRUCTION OF TEHRI DAM, LIKE BHAKRA BAM ( temple of modern India), IS A ONCE IN LIFE TIME EVENT AND I FEEL PRIVILEGED TO HAVE BEEN ASSOCIATED IN IT’S EXECUTION FROM CONCEPT TO COMMISSIONING AND ACQUIRED MULTI DISCIPLINARY EXPERIENCE IN EXECUTION, DCB & ICB BIDDING/DPR/PACKAGING/R&R/ MINISTRY LIASION/ CSR/ WORKS, SUPPLY & SERVICE CONTRACTS/ PROCUREMENT OF POWER PLANT EQUIPMENT ONLAND & MARINE TRANSPORTATION FROM ABROAD/ INSPECTIONS/DRP/ ARBITRATION/ TOWNSHIP/ ROADS/ BRIDGES/ SPILLWAYS/EARTH & ROCKFILL DAM/ COFFER DAM/ POWER HOUSE/ TUNNELING BY DBM ETC

The 260.5 m high Tehri dam is the highest Earth and Rockfill Dam in Asia. It involved resettlement & rehabilitation of 13841 families with irrigation benefits of 2.7 lac ha. of land in UP and drinking water for 40 lac population in Delhi & 30 lac population in UP. It has numerous other multipurpose benefits.

The Top most benefit of Tehri Dam is in giving 1000 MW Peaking Power to 9 states of Northern India for grid stabilization and helping in the Kumbh mela when there is draught like situation. It also saved Rishikesh from devastation due to 2013 floods as it absorbed the inundation of Bhagirathi river for more than 72 hours.

I have been actively involved in various works at the Tehri dam Project during my long stint there like National, International Contracts (with & without financial packages), Inspection, FOB Supplies, execution, CSR, R&R, MoEF clearances , Planning Commission approvals, Ministry of Finance / CCEA clearances, Govt. Liaisoning & expediting, Strategic Planning, Presentations at highest level at the Govt Of India.

To keep the cost & Tariff low, the Project was packaged into the most optimized way. Completiion cost is Rs 8298 Crores. The Unique principles adopted in R&R in Tehri dam have helped to devise the National Rehabilitation & Resettlement Policy 2003 by Govt of India. Visited Russia, Dubai & other places as part of the high level experts Technical & Commercial Negotiations team and to expedite the Supplies. Be it the FOB Supplies (14 shipments completed comprising thousands of packages and 16000 metric tons supplies) from Black Sea Port of Illychevsk Port, Ukraine or the Splitting of the underground Power House Civil Works in 3 Packages- Package I, II & III) , Cofferdam into 4 packages , Contracting Russian design Consultants , Generating equipment from the Consortium of Russian, Ukrainian & German Suppliers, GIS & GIB from Siemens Germany , SCADA system from ABB Germany, Unique in-house design features of the Morning Glory Shaft Spillways , Chute Spillways, separate Contracts for Procurement of ASTM 517 Steel from Sumitomo Japan and Fabrication erection of Penstocks in situ at Site and above all the erection Contract with BHEL, all have helped to keep the total cost of the Project under check and save huge money for the Nation. The Electricity is flowing into the grid since 2006 and 9 states of Northern India are benefitting from the Peaking Power of 1000 MW Tehri Dam. The Corporation started to earn profits and pay dividend from the very Ist year of Commissioning of the Project.

  • The main equipment Contracts are mostly awarded on turnkey basis for major Hydroelectric projects. The Supply Contract for main Electro-mechanical equipment in case of Tehri Stage-I had been awarded on FOB basis with the Russian led Consortium comprising various manufacturers. As such massive efforts/challenging work was to be executed since the complete responsibility from FOB Port (Illychevsk Black Sea Port, Ukraine/Russia to Rishikesh/Tehri till Project site for safe transportation and reaching of the equipment to site was with THDC). Normally in such Contracts the complete responsibility from manufacturing plant right upto project site & erection till final handing over remains with the Foreign Supplier. A major saving in cost has been done by Total tonnage shipped on FOB Basis 16000 MT/23000 CBM. THDC though it has increased the work/efforts and coordination by THDC at various fronts/points for transportation of thousands of packages/sub-assemblies from Illychevsk Port, Ukraine to Russia/Tehri site arranging Insurance/other logistics thereof. Considerable progress has been achieved in this regard and the equipments have been supplied/shipped from the Ukrainian port to Rishikesh/Project site comprising 16 shipments of equipment valuing approx. 121 Million US $ i.e. 100% of the work has been completed in Power Machines, OJSC / Russian Supplies and also 100% has been completed in Alstom/German supplies for supply of Computerised Control System, GIS/GIB from Siemens has also been shipped from Germany.
  • Remittance of foreign payments to EME, Power Machines/ Siemens / Alstom Germany , HPI Moscow in association with Finance Noida through authorized dealer and Reserve Bank of India, New Delhi. Considerable amount of money has been saved by the Corporation in this regard through authorized dealers and deals finalized at most competitive exchange rates.
  • Coordinated and expedited the deputation of various experts viz., generator expert, Storage expert, Turbine expert, stator expert, Rotor/Excitation experts etc. to the project site for Supervision of erection of the main Generating equipments at Project site.
  • While the order for Gas Insulated Switchgear and GI Busducts (under ICB with financing arrangements by way of Buyers’ Credit from KfW, Germany), had been placed on M/s Siemens, Germany, and  down payment made, the Loan Agreements could not be signed immediately on account of reluctance of German authorities to provide the Hermes cover for the Export Credit from KfW on account of concerns raised by the Green lobby in Germany. The contentious issue was got settled by interaction with the German authorities and with the intervention of the Ministry of Power/Ministry of Finance. Subsequently, the Loan Agreements were signed with KfW All the supplies of GIS/GIB have since been despatched and received at site.
  • Discussion with Ministry of Law, Ministry of Finance and Ministry of Power for resolution of the issue of Bills of exchange of EME Russia.
  • Discussion and finalisation of various amendments to the International contracts of EME Russia and HPI Moscow WITH suppliers Credit and drafting of overall agreement.
  • Finalisation of terms & conditions and installation of DRB Panel for various works contracts.
  • Various critical post award contractual prepayment relating to Corporate Contracts including participation in negotiations of retirement / prepayment of the credit of approx. 500 crores. which is likely to result in huge foreign exchange savings for the corporation. A lot of work is done on this account viz approvals of RBI, Ministry of Finance, signing of tripartite agreements, Board approvals and final remittance of amounts to Foreign lenders / Suppliers (in case of suppliers credit) THROUGH sbi, New York.
  • The works of spillway structures had come to a grinding halt in April / May 2004 due to non-availability and scarcity of Micro Silica a priority and specilised item manufactured by very few companies in the World. Secretary (Power ) had constituted a high level empowered committee in May 2004 for urgent procurement of Micro Silica within 15 days. The undersigned had assisted the committee of Directors in procurement of the emergency quantity placed the necessary purchase orders after protracted negotiations with the suppliers. The undersigned had been specially deputed to Dubai for inspection and expediting the supplies from Jabel Ali port, Dubai which was completed and the concreting work resumed at the spillway structure which are the only one of its kind being built in India.

 

KOTESHMWAR DAM – 400 MW

  • Finalisation of tender terms & conditions and pre-bid conferences with bidders for Koteshwar civil works.(400MW), Koteshwar Electro-mechanical works Koteshwar Hydro-mechanical works.
  • Finalisation of terms & conditions and installation of DRB Panel for Power House Civil works contract.
  • Contesting of the writs filed by Continental Construction Ltd. concerning Koteshwar Civil works tender and subsequently the SLP in the Supreme Court and obtained a favourable decision, whereupon the contract for civil works of the Koteshwar Dam Project was awarded to the L1 bidder.
  • Finalisation and signing of the MOU for providing D&E services for Koteshwar Project with CWC, New Delhi.
  • Finalisation and signing of the Retainer Consultancy work for Koteshwar Electro-mechanical work with CEA, New Delhi.

 

TEHRI PSP- 1000 MW

  • Associated in the Finalisation of French aid and conclusion of Agreement for Consultancy Services for preparation of Detailed Project Report for 1000 MW Tehri Pump Storage Plant, being carried out by EdF/CoB, French Consultants.
  • Preparation of terms and conditions of Civil works of 1000 MW Tehri Pump Storage Plant and invitation of bids.
  • Comparative Study of the MOST CRITICAL AND IMPORTANT DECISION OF 2 speed & Variable Speed option for the PSP.

 

The legendary Metro Man Shri E Sreedharan on his visit to the Tehri Dam Complex was exceptionally happy to see the engineering Marvel and asked his Engineers in DMRC to have Tehri dam & its underground Power House Cavern & other Structures as a MUST SEE in their technical up gradation itinerary.

INTERNATIONAL WORK EXPERIENCE

02/1985 – 04/1990

GOVT OF INDIA | IRAQ / UAE / DUBAI / KUWAIT , IRAQ  Assistant Executive Engineer

 

INTERNATIONAL WORK EXPERIENCE IN EXECUTION OF MAJOR PROJECTS USING STATE OF THE ART EQUIPMENT ( IN MIDDLE EAST)

Worked as construction site Incharge (AEE- Asst. Executive Engineer) for the execution of AL EDAWIYAH LAND RECLAMATION PROJECT (Irrigation & Drainage system for Land reclamation and reservoir construction ) under the Ministry of Industry & Minerals, Iraq. During my stay of approx. five years which was the completion period for the Project, executed the following works:

  • A Canal system with 26 Kms Main Canal & Distributaries & Secondaries 74 Kms Length. (Earthfill in embankments 21.9 Million Cum.)
  • Open Drainage system approx. 87 Kms in length ( Excavation & Re-excavation of Borrow areas, Drains & Canals 3.9 Million Cum.)
  • Road embankments with sub-base compaction with pneumatic 18 Tonne tyred vibratory Dynapac compactors. (approx. 45 Kms.)
  • Concreting of Bridges, pipe culverts & structures.
  • Erection of constant Down-stream level radial gates (Hydro Mechanical Equipment) manufactured by Alstom Neyrtec, France.
  • Canal Lining using laser controlled sensors for automatic slipform mechanism & for hot setting & curing of concrete used BCR (trade name) membrane in very hot weather conditions. Komatsu Dozers & a fleet of Massey Ferguson Tractors. 

The above work was completed in time due to systematic, mechanized and close follow-up/ monitoring of the execution of works. Any slippage in a foreign country would have attracted huge & stiff penalties. Thus land reclamation of 65 Sq. Kms. (48000 DONUMS) was timely achieved. 

 

The undersigned has worked on the above project with the latest World renowned state of art Heavy Earth – Moving Equipment of the makes like MAN Germany, Mercedes, Kato, Kawasaki, Alcons, Dynapac, Saka, Hamm, Derrupe (compactors), Schwing concrete placers (England), JCB back hoe, International Excavator (England), Poclain, Caterpillar, Earth Komatsu, Holland drain, Ferguson, Volvo, Hitachi, Elba batching plant, challenge- ccok transit mixers, Wapco & caterpillar scrapers and Gomaco U.S.A. lining machines. As a Site Engineer Incharge of works prepared progress reports/identification of problems/troubles hooting follow-up action required for rectification of the problems.

The above Project was one of the prestigious and challenging assignment for the Govt of India monitored at the highest level in Ministry of External affairs which was completed within the Contract time of 5 years working all 3 shifts and using the best Combo of men & machinery on the Project.