PRESENTLY FOLLOWING ASSIGNMENTS HANDLED
BRIEF BACKGROUND IS AS UNDER ;
Hydro Electric Projects at Joshimath Uttarakhand.
The work at 444 mw vishnugad dipalkot hydro electric, project , 104 mw malan jelam & 114 jelam tamak hydro electric projects, involved multi faceted experience from construction of roads in hilly terrain in most challenging environment, township,, topographic survey for 56 kms using total station leica make state of the art & detailed investigation, fr, dpr, geotechnical investigations, drilling & drifting,, adits,, tunneling by tbm & dbm, bailey bridge erection (army type), 75 r rcc bridge, approach road to dam site in nearly vertical terrain; cofferdam construction etc.
Land acquisition of 8.2 ha & 84 ha of forest land, and more than 300 ha of gram sabha land / pvt land,
Eia study & mitigation under environment protection act 1986 and ppt to eac and environmental clearance from moef.
Led the world bank site missions from the client organization to site. World bank finally provided usd 648 million loan to the project.
Innovation & creativity in signing of tripartite agreement with the villagers / gram pradhans/ gram panchayats for smooth execution of the projects & unique / participative csr works.
Also associated in the implementation/ execution of the koteshwar dam – 400 mw , tehri psp- 1000 mw, vphep – 444 mw, jt hep 114 mw & mj hep 63 mw at various stages as a construction & contract expert.
Associated in the finalisation of french aid and conclusion of agreement for consultancy services for preparation of detailed project report for 1000 mw tehri pump storage plant, being carried out by edf/cob, french consultants.
Preparation of terms and conditions/ commercial conditions / technical specs. Of civil works of 1000 mw tehri pump storage plant and invitation of bids / award of works.
Comparative study of the most critical and important decision of 2 speed & variable speed option for the 1000 mw tehri psp.
TEHRI DAM PROJECT (1000 MW) –
(Worked At The Most Important National Important Hydro Power Project From Concept 2 Commissioning )
CITATIONS & TESTIMONIALS
For Few Referrals For My Professional Acumen & Expertise Please Contact:
01/1985 – Current
DOMESTIC & INTERNATIOANL | INDIA & MIDDLE EAST
POWER SECTOR ENGINEER ( RENEWABLE, HYDRO, THERMAL)
A Civil Engineer topper from NIT , Srinagar Kashmir with 3 Tier Sr Management Course from IIM Ahmedabad having 37 years professional experience (at 22 years age) in leadership/ Contract Management/ CSR/ Forest & Environment Clearances from MoEF / Land Acquisition/ Ministry Liaisoning / Business Development/DCB & ICB Bidding & reverse auction/ Execution of Conventional Power & Renewable Solar Energy Power Projects using innovation , creativity & state of the Art technology.
THDC INDIA LIMITED | DELHI, INDIA GENERAL MANAGER
PRESENTLY WORKING AT THDC INDIA LIMITED – A CATEGORY 1 SCHEDULE A CPSU UNDER MINISTRY OF POWER,GOVT. OF INDIA ON FOLLOWING ASSIGNMENTS :
BRIEF BACKGROUND IS AS UNDER ;
03/2014 – 08/2017
THDC INDIA LIMITED & GOVT. OF INDIA | DELHI/RISHIKESH/ JOSHIMATH/TEHRI/IRAQ/DUBAI/KUWAIT/RUSSIA, INDIA AGM – ASST. EXECUTIVE ENGINEER
2X660 MW KHURJA THERMAL STPP & 8.74 MTPA CAPTIVE COAL MINE/ PUBLIC HEARING/TOR/MOEF CLEARANACE/ LAND ACQUSITION/ DPR/ CONTRACTSPACKAGING / MOC CLEARANCE/RAILWAY SIDING
8.74 MTPA CAPTIVE COAL MINE
07/2009 – 03/2014
THDC INDIA LIMITED | PIPALKOTI/ JOSHIMATH/ UTTARAKHAND, INDIAADDL./ DY.GENERAL MANAGER
PROJECT EXECUTION-
DAM APPROACH ROAD/ DRILLING DRIFTING/ TBM TUNNELING/ BAILEY BRIDGE/ R&R/ CSR/ DPR /SURVEY & INVESTIGATION/ LAND ACQISITION/ EIA/EMP// EAC & FAC MOEF CLEARANCES
10/2007 – 07/2009
THDC INDIA LIMITED | RISHIKESH, INDIA DY GENERAL MANAGER
GOVT./ MINISTRY LIASIONIG /
STRATEGIC PLANNING / BUSINESS DEVELOPMENT
BUSINESS DEVELOPMENT
04/1990 – 10/2007
THDC INDIA LIMITED | TEHRI / DELHI, INDIA ENGINEER – SR MANAGER
TEHRI DAM PROJECT (1000 MW) – Concept 2 Commissioning
CONSTRUCTION OF TEHRI DAM, LIKE BHAKRA BAM ( temple of modern India), IS A ONCE IN LIFE TIME EVENT AND I FEEL PRIVILEGED TO HAVE BEEN ASSOCIATED IN IT’S EXECUTION FROM CONCEPT TO COMMISSIONING AND ACQUIRED MULTI DISCIPLINARY EXPERIENCE IN EXECUTION, DCB & ICB BIDDING/DPR/PACKAGING/R&R/ MINISTRY LIASION/ CSR/ WORKS, SUPPLY & SERVICE CONTRACTS/ PROCUREMENT OF POWER PLANT EQUIPMENT ONLAND & MARINE TRANSPORTATION FROM ABROAD/ INSPECTIONS/DRP/ ARBITRATION/ TOWNSHIP/ ROADS/ BRIDGES/ SPILLWAYS/EARTH & ROCKFILL DAM/ COFFER DAM/ POWER HOUSE/ TUNNELING BY DBM ETC
The 260.5 m high Tehri dam is the highest Earth and Rockfill Dam in Asia. It involved resettlement & rehabilitation of 13841 families with irrigation benefits of 2.7 lac ha. of land in UP and drinking water for 40 lac population in Delhi & 30 lac population in UP. It has numerous other multipurpose benefits.
The Top most benefit of Tehri Dam is in giving 1000 MW Peaking Power to 9 states of Northern India for grid stabilization and helping in the Kumbh mela when there is draught like situation. It also saved Rishikesh from devastation due to 2013 floods as it absorbed the inundation of Bhagirathi river for more than 72 hours.
I have been actively involved in various works at the Tehri dam Project during my long stint there like National, International Contracts (with & without financial packages), Inspection, FOB Supplies, execution, CSR, R&R, MoEF clearances , Planning Commission approvals, Ministry of Finance / CCEA clearances, Govt. Liaisoning & expediting, Strategic Planning, Presentations at highest level at the Govt Of India.
To keep the cost & Tariff low, the Project was packaged into the most optimized way. Completiion cost is Rs 8298 Crores. The Unique principles adopted in R&R in Tehri dam have helped to devise the National Rehabilitation & Resettlement Policy 2003 by Govt of India. Visited Russia, Dubai & other places as part of the high level experts Technical & Commercial Negotiations team and to expedite the Supplies. Be it the FOB Supplies (14 shipments completed comprising thousands of packages and 16000 metric tons supplies) from Black Sea Port of Illychevsk Port, Ukraine or the Splitting of the underground Power House Civil Works in 3 Packages- Package I, II & III) , Cofferdam into 4 packages , Contracting Russian design Consultants , Generating equipment from the Consortium of Russian, Ukrainian & German Suppliers, GIS & GIB from Siemens Germany , SCADA system from ABB Germany, Unique in-house design features of the Morning Glory Shaft Spillways , Chute Spillways, separate Contracts for Procurement of ASTM 517 Steel from Sumitomo Japan and Fabrication erection of Penstocks in situ at Site and above all the erection Contract with BHEL, all have helped to keep the total cost of the Project under check and save huge money for the Nation. The Electricity is flowing into the grid since 2006 and 9 states of Northern India are benefitting from the Peaking Power of 1000 MW Tehri Dam. The Corporation started to earn profits and pay dividend from the very Ist year of Commissioning of the Project.
KOTESHMWAR DAM – 400 MW
TEHRI PSP- 1000 MW
The legendary Metro Man Shri E Sreedharan on his visit to the Tehri Dam Complex was exceptionally happy to see the engineering Marvel and asked his Engineers in DMRC to have Tehri dam & its underground Power House Cavern & other Structures as a MUST SEE in their technical up gradation itinerary.
02/1985 – 04/1990
GOVT OF INDIA | IRAQ / UAE / DUBAI / KUWAIT , IRAQ Assistant Executive Engineer
INTERNATIONAL WORK EXPERIENCE IN EXECUTION OF MAJOR PROJECTS USING STATE OF THE ART EQUIPMENT ( IN MIDDLE EAST)
Worked as construction site Incharge (AEE- Asst. Executive Engineer) for the execution of AL EDAWIYAH LAND RECLAMATION PROJECT (Irrigation & Drainage system for Land reclamation and reservoir construction ) under the Ministry of Industry & Minerals, Iraq. During my stay of approx. five years which was the completion period for the Project, executed the following works:
The above work was completed in time due to systematic, mechanized and close follow-up/ monitoring of the execution of works. Any slippage in a foreign country would have attracted huge & stiff penalties. Thus land reclamation of 65 Sq. Kms. (48000 DONUMS) was timely achieved.
The undersigned has worked on the above project with the latest World renowned state of art Heavy Earth – Moving Equipment of the makes like MAN Germany, Mercedes, Kato, Kawasaki, Alcons, Dynapac, Saka, Hamm, Derrupe (compactors), Schwing concrete placers (England), JCB back hoe, International Excavator (England), Poclain, Caterpillar, Earth Komatsu, Holland drain, Ferguson, Volvo, Hitachi, Elba batching plant, challenge- ccok transit mixers, Wapco & caterpillar scrapers and Gomaco U.S.A. lining machines. As a Site Engineer Incharge of works prepared progress reports/identification of problems/troubles hooting follow-up action required for rectification of the problems.
The above Project was one of the prestigious and challenging assignment for the Govt of India monitored at the highest level in Ministry of External affairs which was completed within the Contract time of 5 years working all 3 shifts and using the best Combo of men & machinery on the Project.